Showing posts with label Projects. Show all posts
Showing posts with label Projects. Show all posts

Sunday, February 19, 2012

Obama Fundraisers Receive Billions for Green-Energy Projects

COMMENTARY | After dishing out billions of dollars in clean-energy subsidies and loan guarantees, the Obama administration has been plagued with a myriad of investment blunders, while taxpayer dollars have been squandered for reasons that seem all too political. The latest "green" energy fiasco involves a seemingly potent brand of crony capitalism, where venture capitalist and Obama fundraiser Sanjay Wagle benefited from billions of dollars in federal handouts.

The U.S. Department of Energy (DOE) supplied $2.4 billion in government funding to clean-energy firms with ties to Wagle's former company, Vantage Point Venture Partners, the Washington Post reported. The DOE funneled the taxpayer-funded dollars over a three-year period to green-energy companies that Wagle's firm had invested in. Additionally, the Post uncovered that nearly $4 billion in federal grants and financing was channeled to 21 companies backed by businesses with ties to five Obama administration staffers and advisers.

The Recovery Act, a so-called economic "stimulus" package signed by President Obama on February 17, 2009, infused some $787 billion into the economy, $80 billion of which was sidelined for green-energy projects and energy-efficiency efforts. Vantage Point's investments reaped a sizable portion of the funding, including firms such as Brightsource, which harvested a $1.6-billion loan for a solar generation plant; Tesla Motors, which was awarded a $465-million loan to build electric cars; and biofuels firm Mascoma, which pocketed $80 million to build an ethanol plant.

Clean Tech for Obama, a fundraising arm co-founded by Wagle to rally the green-energy community behind Obama during the 2008 election, paid off immensely for Wagle's green-tech ventures. Conveniently, shortly after Obama's 2008 triumph, Wagle left Vantage Point to work for the Energy Department, just as the administration launched a prodigious energy program that pumped billions of dollars into green-tech ventures.

But the Obama administration's crony-like behavior is not confined to Wagle's ambitious investment practices and compelling influence in the Energy Department.

Take, for example, venture capitalist and Oklahoma billionaire George Kaiser, who was a chief investor in bankrupt solar panel-maker Solyndra, which reaped a $535-million loan guarantee from the federal government. As the story goes, Kaiser was a prominent fundraiser for Obama's 2008 campaign, raising a reported $50,000 to $100,000 for the president.

Moreover, according to White House visitor logs, Kaiser made three visits to the West Wing on March 12, 2009, and then one more on March 13. It appears his keen political bargaining could have been a pivotal determinant for Solyndra's half-billion dollar federal loan -- which, as we now know, was a massive political boondoggle.

Unfortunately, the end of the line does not stop with Wagle and Kaiser. The Obama administration's and the Energy Department's reckless green-tech ventures have inflicted a heavy burden on U.S. taxpayers, as big-time DOE investments transformed into tumultuous failures -- while, at the same time, bigwig fundraisers who helped ignite Obama's 2008 campaign reaped lucrative rewards.


View the original article here

Wednesday, February 15, 2012

Wind Energy Update: OEMs Keen to Secure Partnerships as PTC Fears Accelerate Projects

Wind Energy Update: With the on-going uncertainty over the production tax credit (PTC) extension, many factors are indicating that the American wind manufacturing industry is picking up speed to cope with a rush of orders in 2012.

London (PRWEB) February 12, 2012

In 2011, an additional 31% of wind capacity was installed compared to 2010, totalling a massive 1.6GW, identified by Wind Energy Update.

As reported by Wind Energy Update, this dramatic increase in project commissioning has widely been attributed to the uncertainty surrounding the PTC extension, a topic being hotly debated throughout the industry and government.

The PTC, worth $0.022 per kWh for a projects’ first ten years of operation is a key driver in the continued planning and commissioning of wind installations. It is also widely seen to be responsible for the creation of thousands of jobs throughout the renewable energy sector, and its expiration will undoubtedly have an adverse effect on the future renewable power industries.


However, the fear of a PTC expiration is currently having the reverse effect on manufacturing companies. With the danger of commissioning projects with no tax incentive looming, developers are looking to fast-track projects to commissioning stage, which is having the knock-on effect of pushing manufacturers’ capacity to the limit, as reported by Wind Energy Update.

This increase in competition has resulted in turbine manufacturers seeking the best possible terms of collaboration with a supplier, often in a strategic mid-term partnership.

A key forum that both client and customer have utilised over the last 2 years to secure such partnerships has been Wind Energy Update’s wind turbine manufacturing and supply chain conference, taking place on the 28-29th March 2012, Chicago. Now in its third year of existence, it has long been a key forum for manufacturers and turbine manufacturers collaborate and connect. With the state of the PTC, this year is widely seen to have greater importance. Not only will the leading turbine manufacturers be present, the DoE will also be represented to elaborate on the kind of support that the industry can hope to expect in 2012 and beyond.

For more information visit http://www.windenergyupdate.com/supplychainUSA

Will Broad


Wind Energy Update


will(at)windenergyupdate(dot)com


Tel: +44 (0) 20 7375 7516

# # #

Will Broad
Wind Energy Update
+44 (0)20 7375 7224
Email Information


View the original article here